For electric vehicle owners, installing a charging station at home has now become standard for many users. Installing a home charging station both providing comfort in daily use and optimizing individual costs. So how does this installation process work? Which steps does it involve and what are the costs?

What happens when installing a Home Charging Station?
There are three basic stages in the installation of an electric vehicle charging station:
- Pulling cable from electricity clock
- Creation of fuse panel and protection line
- Installation of the charger by a professional team
Each step requires different needs and workmanship. Now let's detail these steps:
1. Pulling Cable from Electricity Clock
In order for the charger to work, a cable of appropriate cross-section must be drawn from the electric clock.
Considerations at this stage:
- Distance between the electricity meter and the vehicle parking space
- Suitability of existing cable ducts in the building
- Determining the cable cross-section according to the power requirement of the charger
Cable installations without proper infrastructure, may lead to performance problems or security risks in the future. Therefore, proper planning and professional implementation are important.
2. Fuse Panel and Protection Line
A separate fuse board and protection line are required for safe operation of the charger.
What to do in this section:
- Residual current device (RCD) selection
- Proper fuse (MCB) installation
- Installation of other necessary protection elements
- Grounding and installation compliance control
These protection elements ensure the safety of both the vehicle and the home electrical system.
3. Charger Setup
In this final stage, the electric vehicle charger is installed. This process
- Mounting the device on the wall or on a suitable stand,
- Making electrical connections,
- It includes performing firmware and security tests.
Having this step done by experts is critical for long-term security and performance.
General Characteristics of the Installation Process
Since each house has a different electrical infrastructure, meter location and parking lot, a preliminary survey is an important step before starting the installation. This discovery ensures both the most accurate installation plan and the determination of the materials and equipment to be used.
The following are the main factors that influence the installation process:
- Status of existing electricity infrastructure
- Distance between meter and panel and charging unit
- Carrying capacity of the electrical installation
- Selection of safety and protection equipment
Why Powerşarj?
Electric vehicle charging station installation, is not just about pulling cables. With the right planning:
- Energy efficiency is ensured,
- Your electrical system is protected,
- Possible failures are prevented.
Therefore, working with experts or authorized services ensures a safe and trouble-free use in the long term.
Closing
The cost of installing an electric vehicle charging station at home varies depending on variables such as the labor performed, the current state of the installation and the equipment to be used. The steps we mentioned in this article, why charging station installation should be planned by an expert reveals.
Our team will make your home free to explore and work with us to plan the most suitable installation for you you can contact us.